Resibond

Pleckgate

Pleckgate Hockey pitch construction initially created several problems that needed solving, the first was an unstable sub grade that needed rectifying before any works could take place, this was carried out by means of installing several layers of ground stabilising geotextiles. The area in which the pitch was to be constructed also needed remodelling.

<